Badly defective first floor arches, corbel and moulded brick bands. The area was bowing severely and major strengthening and restoration works were required to get this area back into shape again. Steel strapping fixed to the internal joists was fixed in to hold the area from any further movement. Defective and loose brickwork removed and replaced, set back ready for brick restoration works.